Now accepting HSA/FSA on eligible orders

Learn more

Manufacturing

How we build

Anyone can claim a factory. Very few will show you what happens inside one. Most hyperbaric brands buy finished chambers from a catalogue and put a logo on them. We don't. This page tells you exactly what we own, what we can document, and what you should ask us to prove before you buy anything.

Ownership

We own the line, not a purchase order

We hold a controlling stake in the facility that builds our pressure vessels. Our engineers set the specification, our inspectors sign off the welds, and our name is on the vessel because the vessel is ours.

We don't publish our partner's name. Competitors would use it to buy near copies of our chambers and sell them as equivalents. That protects your chamber's value, not just our margin.

What we will do instead: show qualified buyers the ownership documentation directly, under NDA.

Superhuman team walking a Model X hyperbaric chamber through final assembly on the factory floor
Technicians positioning a Superhuman X hyperbaric chamber on the ASME-certified production line

Certification

ASME certification, verified privately

Our facility holds a current ASME Certificate of Authorization. ASME certifies factories, not paperwork: independent inspectors review the design process, qualify weld procedures and welders, witness pressure tests, and re-audit the shop to keep the certificate alive.

We provide the certificate under NDA to buyers in an active evaluation. We don't publish the number or the document, for the same reason we don't publish the partner name.

Documentation

Every chamber has a file

Each chamber leaves the line with a build record. It ships with the chamber, and we keep a copy for the life of the vessel.

Material certificates

The mill paperwork for the steel and acrylic in your vessel, traceable to the batch it came from.

Weld inspection results

Every structural weld inspected and signed off by name before the vessel moves to testing.

Pressure test data

The recorded test pressure and the date, for the specific vessel you are buying.

Named sign-offs

The people who approved each stage, on record for the life of the chamber.

Quality inspector completing the build record sheet on a Superhuman hard-shell pressure vessel

Our lead engineers are based in California and oversee quality control on every build. One team is accountable from first weld to installation day.

The buyer's test

Ask us for three things

Before you buy any hyperbaric chamber, from us or anyone else, ask the seller for three things:

01

The build record

For the specific chamber you are buying, not a sample.

02

The pressure test data

With the test pressure and the date.

03

A named person

Who is accountable for the vessel, and their credential.

If a seller cannot produce all three, they did not build your chamber. The full six-question version of this test is in who makes your hyperbaric chamber.

Ask us to prove it

Tell us where you are in your evaluation. We will walk you through the ownership documentation, the ASME certificate, and the build record process, under NDA where it applies.